Skip to content

chore: prep v0.5.0 of support package - #77

Draft
mrtnrst wants to merge 2 commits into
feat/http-timeoutsfrom
chore/test-track-test-support-v0.5.0
Draft

mrtnrst wants to merge 2 commits into
feat/http-timeoutsfrom
chore/test-track-test-support-v0.5.0

Conversation

@mrtnrst

@mrtnrst mrtnrst commented Nov 19, 2026

Copy link
Copy Markdown

Summary

Why

#73 updates FakeTestTrack for the test_track 0.5.0 interface but keeps the support package on ^0.4.0, because pana resolves test_track from pub.dev. Once 0.5.0 is published, this PR moves the constraint and restores the check.

How I verified the change

  • With test_track_test_support linked to the local test_track 0.5.0: dart analyze no issues; dart test 37 passed.
  • pana for this package passes only once test_track 0.5.0 is on pub.dev (unverified until then).

Risk / rollback

Breaking for test_track_test_support consumers: FakeTestTrack.login returns Future<TestTrackLoginResult>, and subclasses that override login or overrideVisitorId need the new signatures. Revert to roll back.

🤖 Generated with Claude Code

Requires test_track ^0.5.0 and runs pana for test_track_test_support
again.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
…v0.5.0

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@mrtnrst
mrtnrst added this pull request to stack #78 November 19, 2026 17:15
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant