Skip to content

[Docs] Document ATR release distribution workflow - #562

Open
nzw921rx wants to merge 14 commits into
apache:mainfrom
nzw921rx:feature/atr-release-upload
Open

nzw921rx wants to merge 14 commits into
apache:mainfrom
nzw921rx:feature/atr-release-upload

Conversation

@nzw921rx

@nzw921rx nzw921rx commented Oct 29, 2026 •

Copy link
Copy Markdown
Member

Summary

Add a manual ATR distribution workflow to the existing release guide. Keep the original Maven/Nexus preparation, SVN upload, verification, voting and publication instructions in their original order, with short notes identifying which steps apply to each route.

The ATR section covers release-manager designation, matching draft versions, local signing, browser or SSH/rsync uploads, retrying interrupted uploads, downloading and verifying candidates, and voting/publication through ATR. It uses the existing release archives and requires no ATR Maven plugin or companion SeaTunnel profile.

Correct the Maven settings path from ~/.m2/setting.xml to ~/.m2/settings.xml.

Validation

  • Compared the PR base and final guide: all 36 original fenced command, configuration and example blocks are unchanged and remain in the same order.
  • Preserved the existing section order and legacy SVN upload anchor; renamed the SVN section to match the ATR workflow heading.
  • MDX syntax compilation and internal section-link checks passed.
  • git diff --check passed.
  • No build, signing, upload or deployment command was executed.

No associated issue.

davidzollo
davidzollo previously approved these changes Nov 2, 2026

@davidzollo davidzollo left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

+1
Good job

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants